Construction of strengthening wall attached to diaphragm wall
This record consists of general correspondence regarding the construction of strengthening wall attached to diaphragm wall of BRACU new campus project site.
主要作者: | Brac University |
---|---|
格式: | General correspondence |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/20087 |
相似書籍
-
Quotation for the additional wall attached to the diaphragm wall
由: Brac University
出版: (2023) -
Approval of unit rates of additional wall attached to D-Wall
由: Brac University
出版: (2023) -
Clarification on quotation for additional wall attached to the D-wall
出版: (2023) -
Additional wall attached to diaphragm wall
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Further clarification on quotation for additional wall attached to the D-Wal
由: Brac University
出版: (2023)