Construction of strengthening wall attached to diaphragm wall
This record consists of general correspondence regarding the construction of strengthening wall attached to diaphragm wall of BRACU new campus project site.
Prif Awdur: | Brac University |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20087 |
Eitemau Tebyg
-
Quotation for the additional wall attached to the diaphragm wall
gan: Brac University
Cyhoeddwyd: (2023) -
Approval of unit rates of additional wall attached to D-Wall
gan: Brac University
Cyhoeddwyd: (2023) -
Clarification on quotation for additional wall attached to the D-wall
Cyhoeddwyd: (2023) -
Additional wall attached to diaphragm wall
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Further clarification on quotation for additional wall attached to the D-Wal
gan: Brac University
Cyhoeddwyd: (2023)