Construction of shore pile in zone C
This record consists of general correspondence regarding the construction of shore pile in zone C of BRACU new campus project site.
| Päätekijä: | Brac University |
|---|---|
| Aineistotyyppi: | General correspondence |
| Kieli: | English |
| Julkaistu: |
Brac University
2023
|
| Aiheet: | |
| Linkit: | http://hdl.handle.net/10361/20085 |
Samankaltaisia teoksia
-
VO#028 Proposal of shoring pile works at zone C
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Notice: Commencing the retaining pile and jet grouting pile in Zone C
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Evaluation for additional work of shoring pile work in zone B
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Regarding transporting the steel structure of zone C outside the project
Tekijä: Brac University
Julkaistu: (2023) -
Evaluation for additional work of shoring pile work in zone B
Tekijä: BUCG-ABC Joint Venture