Construction of shore pile in zone C
This record consists of general correspondence regarding the construction of shore pile in zone C of BRACU new campus project site.
| 1. autor: | Brac University |
|---|---|
| Format: | General correspondence |
| Język: | English |
| Wydane: |
Brac University
2023
|
| Hasła przedmiotowe: | |
| Dostęp online: | http://hdl.handle.net/10361/20085 |
Podobne zapisy
-
VO#028 Proposal of shoring pile works at zone C
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Notice: Commencing the retaining pile and jet grouting pile in Zone C
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Evaluation for additional work of shoring pile work in zone B
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Regarding transporting the steel structure of zone C outside the project
od: Brac University
Wydane: (2023) -
Evaluation for additional work of shoring pile work in zone B
od: BUCG-ABC Joint Venture
Wydane: (2023)