Consideration in the electrical system design work
This record consists of general correspondence consideration in the electrical system design work of BRACU new campus project site.
Autore principale: | Brac University |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20076 |
Documenti analoghi
-
Damages to our electric works by BRACU brick vendor
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Confirmation of high voltage electrical conduit work in basement
di: Brac University
Pubblicazione: (2023) -
Design status evaluation for HVAC, plumbing and electricity of BRAC University new campus project
di: BUCG
Pubblicazione: (2023) -
Observation on the electrical design drawings and BoQ
di: Brac University
Pubblicazione: (2023) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023)