Consideration in the electrical system design work
This record consists of general correspondence consideration in the electrical system design work of BRACU new campus project site.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20076 |
مواد مشابهة
-
Damages to our electric works by BRACU brick vendor
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Confirmation of high voltage electrical conduit work in basement
بواسطة: Brac University
منشور في: (2023) -
Design status evaluation for HVAC, plumbing and electricity of BRAC University new campus project
بواسطة: BUCG
منشور في: (2023) -
Observation on the electrical design drawings and BoQ
بواسطة: Brac University
منشور في: (2023) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)