VO.22 – Approval of unit rates of non-schedule item' UPVC pipe changed from PVC pipe for conduit works’
This record consists of general correspondence regarding the clarification approval of unit rates of non-schedule item' UPVC pipe changed from PVC pipe for conduit works of BRACU new campus project site.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20070 |
Podobne zapisy
-
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Approval of non-schedule item for RCC bench & floor joints
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Approval of unit rate of non-schedule item for supplying, fabrication and installation of study nook work
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Approval of unit rate of non-schedule item for supplying fabrication and installation of study nook work
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023)