VO.22 – Approval of unit rates of non-schedule item' UPVC pipe changed from PVC pipe for conduit works’
This record consists of general correspondence regarding the clarification approval of unit rates of non-schedule item' UPVC pipe changed from PVC pipe for conduit works of BRACU new campus project site.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/20070 |
Míreanna comhchosúla
-
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Approval of non-schedule item for RCC bench & floor joints
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Approval of unit rate of non-schedule item for supplying, fabrication and installation of study nook work
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Approval of unit rate of non-schedule item for supplying fabrication and installation of study nook work
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023)