VO.22 – Approval of unit rates of non-schedule item' UPVC pipe changed from PVC pipe for conduit works’
This record consists of general correspondence regarding the clarification approval of unit rates of non-schedule item' UPVC pipe changed from PVC pipe for conduit works of BRACU new campus project site.
Päätekijä: | Brac University |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20070 |
Samankaltaisia teoksia
-
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Approval of non-schedule item for RCC bench & floor joints
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Approval of unit rate of non-schedule item for supplying, fabrication and installation of study nook work
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Approval of unit rate of non-schedule item for supplying fabrication and installation of study nook work
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023)