Observation on delivered pipes and engineer’s instruction to arrange test from BUET
This record consists of general correspondence regarding the observation on delivered pipes and engineer’s instruction to arrange test from BUET for BRACU new campus project.
主要作者: | Brac University |
---|---|
格式: | General correspondence |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/20068 |
相似書籍
-
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
由: Brac University
出版: (2023) -
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
由: Brac University
出版: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Price escalation for plumbing pipe and electricity cable works
由: Brac University
出版: (2023) -
Clarification of instruction
由: Brac University
出版: (2023)