Observation on delivered pipes and engineer’s instruction to arrange test from BUET
This record consists of general correspondence regarding the observation on delivered pipes and engineer’s instruction to arrange test from BUET for BRACU new campus project.
Tác giả chính: | Brac University |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20068 |
Những quyển sách tương tự
-
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
Bằng: Brac University
Được phát hành: (2023) -
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
Bằng: Brac University
Được phát hành: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Price escalation for plumbing pipe and electricity cable works
Bằng: Brac University
Được phát hành: (2023) -
Clarification of instruction
Bằng: Brac University
Được phát hành: (2023)