Observation on delivered pipes and engineer’s instruction to arrange test from BUET
This record consists of general correspondence regarding the observation on delivered pipes and engineer’s instruction to arrange test from BUET for BRACU new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20068 |
Benzer Materyaller
-
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Price escalation for plumbing pipe and electricity cable works
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Clarification of instruction
Yazar:: Brac University