Observation on delivered pipes and engineer’s instruction to arrange test from BUET
This record consists of general correspondence regarding the observation on delivered pipes and engineer’s instruction to arrange test from BUET for BRACU new campus project.
Glavni avtor: | Brac University |
---|---|
Format: | General correspondence |
Jezik: | English |
Izdano: |
Brac University
2023
|
Teme: | |
Online dostop: | http://hdl.handle.net/10361/20068 |
Podobne knjige/članki
-
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
od: Brac University
Izdano: (2023) -
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
od: Brac University
Izdano: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Izdano: (2023) -
Price escalation for plumbing pipe and electricity cable works
od: Brac University
Izdano: (2023) -
Clarification of instruction
od: Brac University
Izdano: (2023)