Observation on delivered pipes and engineer’s instruction to arrange test from BUET
This record consists of general correspondence regarding the observation on delivered pipes and engineer’s instruction to arrange test from BUET for BRACU new campus project.
Հիմնական հեղինակ: | Brac University |
---|---|
Ձևաչափ: | General correspondence |
Լեզու: | English |
Հրապարակվել է: |
Brac University
2023
|
Խորագրեր: | |
Առցանց հասանելիություն: | http://hdl.handle.net/10361/20068 |
Նմանատիպ նյութեր
-
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
: Brac University
Հրապարակվել է: (2023) -
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
: Brac University
Հրապարակվել է: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
: BUCG-ABC Joint Venture (BUCG-ABC JV)
Հրապարակվել է: (2023) -
Price escalation for plumbing pipe and electricity cable works
: Brac University
Հրապարակվել է: (2023) -
Clarification of instruction
: Brac University
Հրապարակվել է: (2023)