Observation on delivered pipes and engineer’s instruction to arrange test from BUET
This record consists of general correspondence regarding the observation on delivered pipes and engineer’s instruction to arrange test from BUET for BRACU new campus project.
第一著者: | Brac University |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/20068 |
類似資料
-
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
著者:: Brac University
出版事項: (2023) -
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
著者:: Brac University
出版事項: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Price escalation for plumbing pipe and electricity cable works
著者:: Brac University
出版事項: (2023) -
Clarification of instruction
著者:: Brac University
出版事項: (2023)