Obstacles in different floors to do the brickwork by NS Construction
This record consists of general correspondence regarding obstacles in different floors to do the brickwork by NS Construction, contractor of BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20065 |
مواد مشابهة
-
Obstacles in different floors to do the brickwork by NS Construction
بواسطة: Brac University
منشور في: (2023) -
Instruction to complete the ledge and brickwork as per work plan
بواسطة: Brac University
منشور في: (2023) -
Instruction for commencement of brick works at toilet zone area of all floors
بواسطة: Brac University
منشور في: (2023) -
To start brick works immediately
بواسطة: Brac University
منشور في: (2023) -
Instruction for commencement of brick works at toilet zone area of all floors of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)