Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
This record consists of general correspondence regarding the payment of supply, installation, testing and commissioning of Busbar Trunking System (BBT) for BRACU new campus project.
Hovedforfatter: | Brac University |
---|---|
Format: | General correspondence |
Sprog: | English |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/20063 |
Lignende værker
-
Electrical BBT system drawing
af: WOHA Designs PTE LTD, et al.
Udgivet: (2023) -
Instruction to start the work at BRACU new campus project (BBT system)
af: Brac University
Udgivet: (2023) -
Supply, installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested busbar trunking (BBT) system etc. for 13 storied Brac University new campus building at holding no. Kha 224, Merul Badda, - Dhaka-1212. ,
af: Brac University
Udgivet: (2023) -
Purchase order for supply, installation and testing of the IT floor trunk, conduit, and groove cutting in the recessed area in different floor of BracU new campus building
af: Brac University
Udgivet: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
af: Brac University
Udgivet: (2023)