Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
This record consists of general correspondence regarding the payment of supply, installation, testing and commissioning of Busbar Trunking System (BBT) for BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20063 |
مواد مشابهة
-
Electrical BBT system drawing
بواسطة: WOHA Designs PTE LTD, وآخرون
منشور في: (2023) -
Instruction to start the work at BRACU new campus project (BBT system)
بواسطة: Brac University
منشور في: (2023) -
Supply, installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested busbar trunking (BBT) system etc. for 13 storied Brac University new campus building at holding no. Kha 224, Merul Badda, - Dhaka-1212. ,
بواسطة: Brac University
منشور في: (2023) -
Purchase order for supply, installation and testing of the IT floor trunk, conduit, and groove cutting in the recessed area in different floor of BracU new campus building