Pending items needed submissions from BUCG
This record consists of general correspondence regarding submission of pending required items from BUCG of BRAC University new campus project.
Tác giả chính: | Brac University |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20044 |
Những quyển sách tương tự
-
Pending items needed submissions from BUCG-ABC JV
Bằng: Brac University
Được phát hành: (2023) -
Pending issues of design coordination for 1F-3F construction of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
The engineer’s instruction regarding scrap items
Bằng: Brac University
Được phát hành: (2023) -
Submission of method statement for anti-termite treatment work over the plinth filling as per BOQ Item No. 4.4
Bằng: Brac University
Được phát hành: (2023) -
Variation order#44 Approval of non-schedule items' quantity and BoQ item for RCC bench & floor joints at stair
Bằng: Brac University
Được phát hành: (2023)