Pending items needed submissions from BUCG
This record consists of general correspondence regarding submission of pending required items from BUCG of BRAC University new campus project.
Главный автор: | Brac University |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/20044 |
Схожие документы
-
Pending items needed submissions from BUCG-ABC JV
по: Brac University
Опубликовано: (2023) -
Pending issues of design coordination for 1F-3F construction of BRAC University new campus project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
The engineer’s instruction regarding scrap items
по: Brac University
Опубликовано: (2023) -
Submission of method statement for anti-termite treatment work over the plinth filling as per BOQ Item No. 4.4
по: Brac University
Опубликовано: (2023) -
Variation order#44 Approval of non-schedule items' quantity and BoQ item for RCC bench & floor joints at stair
по: Brac University
Опубликовано: (2023)