Pending items needed submissions from BUCG
This record consists of general correspondence regarding submission of pending required items from BUCG of BRAC University new campus project.
第一著者: | Brac University |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/20044 |
類似資料
-
Pending items needed submissions from BUCG-ABC JV
著者:: Brac University
出版事項: (2023) -
Pending issues of design coordination for 1F-3F construction of BRAC University new campus project
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
The engineer’s instruction regarding scrap items
著者:: Brac University
出版事項: (2023) -
Submission of method statement for anti-termite treatment work over the plinth filling as per BOQ Item No. 4.4
著者:: Brac University
出版事項: (2023) -
Variation order#44 Approval of non-schedule items' quantity and BoQ item for RCC bench & floor joints at stair
著者:: Brac University
出版事項: (2023)