VO#043 Approval of the cost for supplying the material components of internal electrification works
This record consists of general correspondence regarding the approval of the cost for supplying the material components of internal electrification works of BRAC University new campus project.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/20027 |
Míreanna comhchosúla
-
VO#043 Quotation for components material cost in internal electrification works rev.00
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
VO#043 Quotation for components material cost in internal electrification works rev.01
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Approval of the cost for supplying the material components of internal electrification works
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
PE#01 Approval of price escalation (PE) for internal electrification works
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Approval of price escalation for internal electrification works
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023)