Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
This record consists of general correspondence regarding use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6 of BRAC University new campus project.
Päätekijä: | Brac University |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20017 |
Samankaltaisia teoksia
-
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5. and 5.2, 7.1.4, 7.2.6
Tekijä: Brac University
Julkaistu: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
Tekijä: Brac University
Julkaistu: (2023) -
The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
Tekijä: Brac University
Julkaistu: (2023) -
Offer to do the fire protection coating at increased quantity of BOQ item no.10.2
Tekijä: Brac University
Julkaistu: (2023) -
Request to release balance amount under BOQ 3.6
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)