Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
This record consists of general correspondence regarding the flush valve issue that caused delay of the plumbing works as well as tiling works for the bath rooms in BRACU new campus project.
Главный автор: | Brac University |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/20013 |
Схожие документы
-
Replacement of the defective flush valve
по: Brac University
Опубликовано: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
по: Brac University
Опубликовано: (2023) -
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
по: Brac University
Опубликовано: (2023) -
Instruction to replace all the flash valves of the WC
по: Brac University
Опубликовано: (2023) -
Letter of flush valve replacement
по: Tillotoma Gulshan
Опубликовано: (2023)