Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
This record consists of general correspondence regarding the flush valve issue that caused delay of the plumbing works as well as tiling works for the bath rooms in BRACU new campus project.
Hoofdauteur: | Brac University |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20013 |
Gelijkaardige items
-
Replacement of the defective flush valve
door: Brac University
Gepubliceerd in: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
door: Brac University
Gepubliceerd in: (2023) -
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
door: Brac University
Gepubliceerd in: (2023) -
Instruction to replace all the flash valves of the WC
door: Brac University
Gepubliceerd in: (2023) -
Letter of flush valve replacement
door: Tillotoma Gulshan
Gepubliceerd in: (2023)