Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
This record consists of general correspondence regarding the flush valve issue that caused delay of the plumbing works as well as tiling works for the bath rooms in BRACU new campus project.
Auteur principal: | Brac University |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20013 |
Documents similaires
-
Replacement of the defective flush valve
par: Brac University
Publié: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
par: Brac University
Publié: (2023) -
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
par: Brac University
Publié: (2023) -
Instruction to replace all the flash valves of the WC
par: Brac University
Publié: (2023) -
Letter of flush valve replacement
par: Tillotoma Gulshan
Publié: (2023)