Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
This record consists of general correspondence regarding the flush valve issue that caused delay of the plumbing works as well as tiling works for the bath rooms in BRACU new campus project.
Κύριος συγγραφέας: | Brac University |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/20013 |
Παρόμοια τεκμήρια
-
Replacement of the defective flush valve
ανά: Brac University
Έκδοση: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
ανά: Brac University
Έκδοση: (2023) -
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
ανά: Brac University
Έκδοση: (2023) -
Instruction to replace all the flash valves of the WC
ανά: Brac University
Έκδοση: (2023) -
Letter of flush valve replacement
ανά: Tillotoma Gulshan
Έκδοση: (2023)