Regarding test result as well as visual inspection report on the fire protection pipes
This record consists of general correspondence regarding the test result as well as visual inspection report on the fire protection pipes of BRACU new campus project.
Yazar: | |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20009 |