Regarding test result as well as visual inspection report on the fire protection pipes
This record consists of general correspondence regarding the test result as well as visual inspection report on the fire protection pipes of BRACU new campus project.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20009 |
Podobne zapisy
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
od: Brac University
Wydane: (2023) -
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
od: Brac University
Wydane: (2023) -
Formats to be used for material, work inspection, testing and reporting for the Fire Protection System works
od: Brac University
Wydane: (2023) -
Regarding fire incidents and further precaution
od: Brac University
Wydane: (2023) -
Delay in completion of fire protection and detection work
od: Brac University
Wydane: (2023)