Regarding test result as well as visual inspection report on the fire protection pipes
This record consists of general correspondence regarding the test result as well as visual inspection report on the fire protection pipes of BRACU new campus project.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/20009 |
Míreanna comhchosúla
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Formats to be used for material, work inspection, testing and reporting for the Fire Protection System works
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Regarding fire incidents and further precaution
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Delay in completion of fire protection and detection work
de réir: Brac University
Foilsithe / Cruthaithe: (2023)