Regarding test result as well as visual inspection report on the fire protection pipes
This record consists of general correspondence regarding the test result as well as visual inspection report on the fire protection pipes of BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20009 |
مواد مشابهة
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
بواسطة: Brac University
منشور في: (2023) -
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
بواسطة: Brac University
منشور في: (2023) -
Formats to be used for material, work inspection, testing and reporting for the Fire Protection System works
بواسطة: Brac University
منشور في: (2023) -
Regarding fire incidents and further precaution
بواسطة: Brac University
منشور في: (2023) -
Delay in completion of fire protection and detection work
بواسطة: Brac University
منشور في: (2023)