Regarding test result as well as visual inspection report on the fire protection pipes
This record consists of general correspondence regarding the test result as well as visual inspection report on the fire protection pipes of BRACU new campus project.
প্রধান লেখক: | Brac University |
---|---|
বিন্যাস: | General correspondence |
ভাষা: | English |
প্রকাশিত: |
Brac University
2023
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/20009 |
অনুরূপ উপাদানগুলি
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Formats to be used for material, work inspection, testing and reporting for the Fire Protection System works
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Regarding fire incidents and further precaution
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Delay in completion of fire protection and detection work
অনুযায়ী: Brac University
প্রকাশিত: (2023)