Status of metal railing work
This record consists of general correspondence regarding the status of metal railing work of BRACU new campus project.
Huvudupphovsman: | Brac University |
---|---|
Materialtyp: | General correspondence |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/20004 |
Liknande verk
-
Status of metal railing work of BRAC University new campus project
av: Brac University
Publicerad: (2023) -
PE#03 Price escalation of railing works rev.00
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Rectifying the railing mock-up and install in the BRAC University new campus project site
av: Brac University
Publicerad: (2023) -
Instruction about R5 railing and updating architectural and structural drawing
av: Brac University
Publicerad: (2023) -
Work progress status
av: Brac University
Publicerad: (2023)