Status of metal railing work
This record consists of general correspondence regarding the status of metal railing work of BRACU new campus project.
Autore principale: | Brac University |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20004 |
Documenti analoghi
-
Status of metal railing work of BRAC University new campus project
di: Brac University
Pubblicazione: (2023) -
PE#03 Price escalation of railing works rev.00
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Rectifying the railing mock-up and install in the BRAC University new campus project site
di: Brac University
Pubblicazione: (2023) -
Instruction about R5 railing and updating architectural and structural drawing
di: Brac University
Pubblicazione: (2023) -
Work progress status
di: Brac University
Pubblicazione: (2023)