Status of metal railing work
This record consists of general correspondence regarding the status of metal railing work of BRACU new campus project.
मुख्य लेखक: | Brac University |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/20004 |
समान संसाधन
-
Status of metal railing work of BRAC University new campus project
द्वारा: Brac University
प्रकाशित: (2023) -
PE#03 Price escalation of railing works rev.00
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Rectifying the railing mock-up and install in the BRAC University new campus project site
द्वारा: Brac University
प्रकाशित: (2023) -
Instruction about R5 railing and updating architectural and structural drawing
द्वारा: Brac University
प्रकाशित: (2023) -
Work progress status
द्वारा: Brac University
प्रकाशित: (2023)