Status of metal railing work
This record consists of general correspondence regarding the status of metal railing work of BRACU new campus project.
Auteur principal: | Brac University |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20004 |
Documents similaires
-
Status of metal railing work of BRAC University new campus project
par: Brac University
Publié: (2023) -
PE#03 Price escalation of railing works rev.00
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Rectifying the railing mock-up and install in the BRAC University new campus project site
par: Brac University
Publié: (2023) -
Instruction about R5 railing and updating architectural and structural drawing
par: Brac University
Publié: (2023) -
Work progress status
par: Brac University
Publié: (2023)