Status of metal railing work
This record consists of general correspondence regarding the status of metal railing work of BRACU new campus project.
Prif Awdur: | Brac University |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20004 |
Eitemau Tebyg
-
Status of metal railing work of BRAC University new campus project
gan: Brac University
Cyhoeddwyd: (2023) -
PE#03 Price escalation of railing works rev.00
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Rectifying the railing mock-up and install in the BRAC University new campus project site
gan: Brac University
Cyhoeddwyd: (2023) -
Instruction about R5 railing and updating architectural and structural drawing
gan: Brac University
Cyhoeddwyd: (2023) -
Work progress status
gan: Brac University
Cyhoeddwyd: (2023)