Status of metal railing work
This record consists of general correspondence regarding the status of metal railing work of BRACU new campus project.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20004 |
Registros relacionados
-
Status of metal railing work of BRAC University new campus project
por: Brac University
Publicado em: (2023) -
PE#03 Price escalation of railing works rev.00
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Rectifying the railing mock-up and install in the BRAC University new campus project site
por: Brac University
Publicado em: (2023) -
Instruction about R5 railing and updating architectural and structural drawing
por: Brac University
Publicado em: (2023) -
Work progress status
por: Brac University
Publicado em: (2023)