Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site

This record consists of general correspondence regarding the clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by university authority and pumps delivered by the contractor at BRACU new campus project site.

Sonraí bibleagrafaíochta
Príomhchruthaitheoir: Brac University
Formáid: General correspondence
Teanga:English
Foilsithe / Cruthaithe: Brac University 2023
Ábhair:
Rochtain ar líne:http://hdl.handle.net/10361/19995