Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site

This record consists of general correspondence regarding the clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by university authority and pumps delivered by the contractor at BRACU new campus project site.

Podrobná bibliografie
Hlavní autor: Brac University
Médium: General correspondence
Jazyk:English
Vydáno: Brac University 2023
Témata:
On-line přístup:http://hdl.handle.net/10361/19995