Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
This record consists of general correspondence regarding the clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by university authority and pumps delivered by the contractor at BRACU new campus project site.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/19995 |
Podobne zapisy
-
Six simple pumps : a construction guide/
Wydane: (1983) -
The Treadle pump : manual of irrigation for small farmers in Bangladesh /
od: Orr, Alastair
Wydane: (1991) -
Regarding inspection report of fire pump at BRACU NCP
od: Brac University
Wydane: (2023) -
Design and development of a controller for switching solar based multiple pumps
od: Ahmed, Syeda Mahjabin, i wsp.
Wydane: (2017) -
Hand pump maintenance in the context of community well projects : an Oxfam document /
od: Pacey, Arnold
Wydane: (1977)