University, B. (2023). Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site. Brac University.

Չիկագոյի ոճի (17րդ խմբ.) մեջբերում

University, Brac. Clarification Needed from Patterson Pumps (the Manufacturer) Regarding a Major Difference Between the Pumps Ordered by BRAC University and Pumps Delivered by the Contractor at Project Site. Brac University, 2023.

MLA (8րդ խմբ.) Մեջբերում

University, Brac. Clarification Needed from Patterson Pumps (the Manufacturer) Regarding a Major Difference Between the Pumps Ordered by BRAC University and Pumps Delivered by the Contractor at Project Site. Brac University, 2023.