Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
This record consists of general correspondence regarding the completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves of BRACU new campus project.
Главный автор: | |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/19993 |