Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves

This record consists of general correspondence regarding the completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves of BRACU new campus project.

ग्रंथसूची विवरण
मुख्य लेखक: Brac University
स्वरूप: General correspondence
भाषा:English
प्रकाशित: Brac University 2023
विषय:
ऑनलाइन पहुंच:http://hdl.handle.net/10361/19993