Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves

This record consists of general correspondence regarding the completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves of BRACU new campus project.

מידע ביבליוגרפי
מחבר ראשי: Brac University
פורמט: General correspondence
שפה:English
יצא לאור: Brac University 2023
נושאים:
גישה מקוונת:http://hdl.handle.net/10361/19993