Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves

This record consists of general correspondence regarding the completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves of BRACU new campus project.

গ্রন্থ-পঞ্জীর বিবরন
প্রধান লেখক: Brac University
বিন্যাস: General correspondence
ভাষা:English
প্রকাশিত: Brac University 2023
বিষয়গুলি:
অনলাইন ব্যবহার করুন:http://hdl.handle.net/10361/19993