Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves

This record consists of general correspondence regarding the completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves of BRACU new campus project.

التفاصيل البيبلوغرافية
المؤلف الرئيسي: Brac University
التنسيق: General correspondence
اللغة:English
منشور في: Brac University 2023
الموضوعات:
الوصول للمادة أونلاين:http://hdl.handle.net/10361/19993