Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
This record consists of general correspondence regarding the completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves of BRACU new campus project.
Автор: | Brac University |
---|---|
Формат: | General correspondence |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/19993 |
Схожі ресурси
-
Replacement of the defective flush valve
за авторством: Brac University
Опубліковано: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
за авторством: Brac University
Опубліковано: (2023) -
Instruction to replace all the flash valves of the WC
за авторством: Brac University
Опубліковано: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
за авторством: Brac University
Опубліковано: (2023) -
Letter of flush valve replacement
за авторством: Tillotoma Gulshan
Опубліковано: (2023)