Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
This record consists of general correspondence regarding the completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves of BRACU new campus project.
Autore principale: | Brac University |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/19993 |
Documenti analoghi
-
Replacement of the defective flush valve
di: Brac University
Pubblicazione: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
di: Brac University
Pubblicazione: (2023) -
Instruction to replace all the flash valves of the WC
di: Brac University
Pubblicazione: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
di: Brac University
Pubblicazione: (2023) -
Letter of flush valve replacement
di: Tillotoma Gulshan
Pubblicazione: (2023)