Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
This record consists of general correspondence regarding the completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves of BRACU new campus project.
Glavni autor: | Brac University |
---|---|
Format: | General correspondence |
Jezik: | English |
Izdano: |
Brac University
2023
|
Teme: | |
Online pristup: | http://hdl.handle.net/10361/19993 |
Similar Items
-
Replacement of the defective flush valve
od: Brac University
Izdano: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
od: Brac University
Izdano: (2023) -
Instruction to replace all the flash valves of the WC
od: Brac University
Izdano: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
od: Brac University
Izdano: (2023) -
Letter of flush valve replacement
od: Tillotoma Gulshan
Izdano: (2023)