Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
This record consists of general correspondence regarding the completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves of BRACU new campus project.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/19993 |
Ejemplares similares
-
Replacement of the defective flush valve
por: Brac University
Publicado: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
por: Brac University
Publicado: (2023) -
Instruction to replace all the flash valves of the WC
por: Brac University
Publicado: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
por: Brac University
Publicado: (2023) -
Letter of flush valve replacement
por: Tillotoma Gulshan
Publicado: (2023)